Sealed competitive
quotations are invited for the “Providing
path bridge across the natural drain in Arboretum and Bamboosetum at FRC
Palappilly using Fabricated steel structure”
so as to reach the undersigned on or before 3rd September 2025 up to 3 PM. The quotations will be opened on the same day
at 3.30 P.M. If the last date of submission of quotation happens to be a
holiday last date will be next working day.
Rate quoted shall be
including GST. You have to submit an invoice showing total value of work done including GST at the time of payment.
Name of work:
- “Providing path bridge across the
natural drain in Arboretum and Bamboosetum at FRC Palappilly using Fabricated
steel structure”
Total
Weight -288Kg
Time
of Completion- 10days
More details can be had from the Institute Engineer on all working days. The institute reserves the right to reject any /all quotations without assigning any reasons whatsoever.